![](http://www.projectcontrolsgroup.com/wp-content/uploads/2017/01/The-New-I-64-Design-Build-Project.jpg)
The New I-64 Design/Build Project
Transit
This project included rebuilding 10.5 miles of I-64 in St. Louis from Spoede Rd. to Kingshighway. The project included right-of way acquisitions, utility relocations, repaving the entire expressway, constructing retaining walls, rebuilding the overpasses and interchanges, adding a fourth lane between Spoede Rd. and I-170, and connecting I-64 to I-170 in all directions.