Missouri Botanical Gardens Parking Lot Renovation

Parks

This project included selective demolition, bio-retention area and bridges; 17 storm sewer structures (manholes, catch basins and piping), asphalt parking area, ornamental metal fences and gates; stone masonry; irrigation systems; signage and electrical (power and lighting).